In 2018, 2019, 2020 and 2021, these upgrades were completed:
the Social Room upgraded!
Pool Upgrade and Heating Project
Pool Furniture Upgrade
Pool Area Landscape Upgrade
Elevator Modernization
New Water Tank and Upgraded Fire Suppression System
Tower Roof Replacement
Lobby Refurbishment and Mail Room upgrade
Relining of waste pipes
Replacement of boilers
Painting, outside of building and garage
Painting, inside hallways
New carpets and flooring and lighting in hallways
Upgrade of the domestic water system and installation of TAC water conditioning
Major electric system elements upgraded
Fire safety system upgraded
Lobby terrazzo flooring refurbished