Moving Forward

Looking Back:

In 2018, 2019, 2020 and 2021, these upgrades were completed:

  • the Social Room upgraded!

  • Pool Upgrade and Heating Project

  • Pool Furniture Upgrade

  • Pool Area Landscape Upgrade

  • Elevator Modernization

  • New Water Tank and Upgraded Fire Suppression System

  • Tower Roof Replacement

  • Lobby Refurbishment and Mail Room upgrade

  • Relining of waste pipes

  • Replacement of boilers

  • Painting, outside of building and garage

  • Painting, inside hallways

  • New carpets and flooring and lighting in hallways

  • Upgrade of the domestic water system and installation of TAC water conditioning

  • Major electric system elements upgraded

  • Fire safety system upgraded

  • Lobby terrazzo flooring refurbished